Reliable IT cooling starts with proper planning. Heat load, power density, airflow, and the cooling system must be taken into account, as must redundancy and system behavior during malfunctions. We’ll show you what matters most for design and operational reliability, and how existing cooling systems can be expanded and modernized.
Planning IT cooling does not begin with the selection of a specific cooling unit. First, you must consider the heat load, power density, temperature requirements, airflow, availability, and the existing infrastructure.
Only based on these framework conditions can one determine which cooling concept is suitable for a server room or a data center. We have summarized the most important points for planning here.
1. Determine the actual heat load
The starting point is the heat emitted by servers, storage devices, network equipment, and other components. In doing so, one should not rely solely on connected or rated power figures. What matters are the actual operating power ratings as well as realistic reserves for future expansions.
We explain in more detail how to determine cooling requirements in the article How is the cooling capacity for server rooms and data centers determined?
2. Consider the power density of the racks
In addition to the total power, the distribution of the heat load within the room is crucial. 100 kW distributed evenly across many racks places different demands on the cooling system than the same power output concentrated on a few heavily loaded racks.
Therefore, the total heat load and local rack power densities should be considered together. As power density increases, the question may arise as to whether conventional air cooling is sufficient or whether other—or combined—cooling methods make sense.
You can find more information on this in the articles: Server Room, Data Center, and High-Density IT and Air Cooling or Liquid Cooling.
3. Determining Appropriate Operating Temperatures
IT systems must be operated reliably within their intended temperature ranges. However, unnecessarily low target temperatures are not automatically safer and can increase the energy requirements for cooling.
We explain which temperature ranges can be taken into account during planning in the article What Temperatures Are Suitable for Server Rooms and Data Centers?.
4. Plan Airflow Early On
Adequate cooling capacity is of little use if the cooled air does not reach where it is needed. Rack layout, cold and hot aisles, airflow paths, and the position of the cooling units should therefore be planned together.
The goal is to minimize the mixing of cold supply air and warm server exhaust air as much as possible. You can find the basics on this topic in the article: Cold Aisle and Hot Aisle – Planning Airflow Correctly in the Data Center .
5. Selecting the Right Cooling Concept
Only once the heat load, power density, temperatures, and spatial conditions are known should the actual cooling system be selected.
Depending on the application, options include, for example, direct or indirect free-air cooling, recirculating air cooling, cooling walls, mechanical refrigeration, or combined systems. The decision between an integrated refrigeration system and an external chilled water supply is also part of this planning step.
Our section on IT Cooling Systems and Cooling Concepts provides an overview of these options.
6. Define Availability and Redundancy
For business-critical IT, it must be clarified during the planning phase what consequences the failure of a cooling unit or a component may have. This gives rise to requirements regarding redundancy, power supply, cooling supply, control systems, and fault notifications.
However, simply adding an additional cooling unit does not necessarily mean that the entire cooling system is automatically redundant. In the next article, we’ll discuss which concepts are possible: Redundancy in Data Center Cooling—N, N+1, and 2N—explained in an easy-to-understand way.
7. Consider Expansions and Future Requirements
Data centers are constantly evolving. New generations of servers can significantly increase the overall performance and, in particular, the power density of individual racks. Good planning therefore takes potential expansions into account from the outset when designing airflow paths, cooling supply, power supply, and installation space.
Reserves should not be confused with blanket oversizing. A more sensible approach is a system design that can be operated according to need and expanded as required.
Planning IT Cooling as a Comprehensive System
Reliable and efficient IT cooling results from the interplay of many factors. Heat load, airflow, cooling system, refrigeration supply, control, and redundancy should therefore not be considered in isolation from one another.
HANSA develops cooling solutions for server rooms and data centers tailored to each specific project. Depending on the application and existing infrastructure, unit dimensions, airflow rates, heat exchangers, fans, refrigeration technology, control systems, and redundancy can be tailored to the respective project.
Redundancy in Data Center Cooling—N, N+1, and 2N Explained in Simple Terms
If the cooling system in a server room or data center fails, the temperature can rise significantly within a short period of time. For critical IT infrastructure, cooling systems are therefore often designed with redundancy.
Terms such as N, N+1, and 2N describe what additional capacity or systems are available in the event of a failure or during maintenance. However, the number of cooling units alone is not the decisive factor. Redundancy only works if the units, refrigerant supply, control systems, power supply, and airflow are considered as a single integrated system.
What does “N” mean in IT cooling?
N refers to the cooling capacity or the number of components required for normal operation.
For example, if three cooling units are needed to reliably dissipate the required heat load, these three units correspond to the necessary capacity N.
If no additional reserve is available, the failure of a single unit may result in the remaining cooling capacity no longer being sufficient. Maintenance work can then only be performed to a limited extent or with reduced cooling capacity.
What does N+1 mean?
In an N+1 concept, in addition to the required cooling capacity, an additional unit or sufficient additional capacity is provided as a reserve.
For example, if three units are needed to provide the required cooling capacity, a fourth unit can ensure that the necessary capacity can still be provided even if one unit fails or is undergoing maintenance. N+1 thus offers additional security without having to duplicate the entire cooling system.
N+1 thus offers additional reliability without having to build the entire cooling system twice.
Why isn’t one additional cooling unit sufficient for N+1?
A common mistake is to consider redundancy solely in terms of the installed cooling capacity. While a fourth unit in addition to the three required units does create additional capacity—this does not, however, result in a reliably functioning N+1 system.
The control system must manage the unit cluster accordingly. Depending on the system design, this includes, among other things: the detection of a malfunction or unit failure;
- Detection of a malfunction or unit failure,
- automatic assumption of the required cooling capacity,
- coordination of multiple units within the cluster,
- demand-based activation and deactivation of individual units,
- defined return to normal operation after a malfunction,
- alerting and reporting relevant operating conditions.
Only the combination of sufficient reserve capacity and a suitable control strategy turns multiple cooling units into a resilient redundancy concept.
Should the backup unit remain permanently idle?
An N+1 system does not necessarily have to be operated in such a way that a unit remains permanently shut down, waiting to be deployed.
An alternative is alternating or shared operation. The control system can switch between the available units on a rotating basis or distribute the required cooling capacity across multiple units. This helps balance operating hours and allows the functionality of the individual units to be regularly verified in real-world operation.
Which strategy makes sense depends on the unit technology, part-load behavior, availability requirements, and the respective system design.
How does HANSA implement N+1 control systems?
HANSA has many years of experience with redundant IT cooling systems and the control technology required for them. One example of this is the Slim Line.
Via the DDC controllers, multiple units can communicate with one another and be connected to form an N+1 system. The communication required for redundancy and system switchover takes place via a bus connection between the controllers.
In addition to the actual switchover, intermittent operating modes and periodic load switching can also be implemented. This allows the control strategy to be tailored to the desired operation of the unit cluster.
This control expertise is particularly crucial for more complex systems: It is not the number of installed units that determines operational reliability, but rather how reliably they work together during normal operation, at partial load, during maintenance, and in the event of a fault.
What does 2N mean?
In a 2N concept, the capacity required for operation is always provided in double. Instead of a single additional backup unit, two complete capacities or supply paths are available.
However, simply doubling the number of cooling units is not sufficient to ensure high actual availability. If both systems are supplied by the same critical infrastructure, common points of failure may still exist.
Depending on the required level of availability, it is therefore also necessary to consider the refrigeration or chilled water supply, pumps, power supply, control systems, and other shared components. Redundancy must take the entire cold chain into account.
Redundancy Must Take the Entire Cooling Chain Into Account
A redundant cooling unit is of little use if, in the event of a malfunction, the shared refrigeration or power supply fails at the same time. Therefore, the entire functional chain should be considered during planning.
Depending on the cooling system, this may include, for example, the following components:
- Cooling and ventilation units,
- fans and compressors,
- chillers and recoolers,
- pumps and hydraulic systems,
- Power supply,
- Sensors and control systems,
- Communication and fault messages.
The crucial question is whether a single failure in a shared component can simultaneously take multiple supposedly redundant systems out of service.
Which redundancy concept is the right one?
Whether N, N+1, or a more extensive redundant structure is required depends on the importance of the IT infrastructure and the acceptable consequences of a failure. The higher the required availability, the more comprehensively the entire cooling and supply structure must be considered.
There is therefore no one-size-fits-all solution. Redundancy should be planned on a project-specific basis in conjunction with cooling capacity, airflow, refrigerant supply, power supply, control systems, and maintenance strategy. We explain how heat load, power density, and cooling systems are fundamentally
We explain how heat load, power density, and the cooling system are generally integrated in the article “Planning IT Cooling Correctly—The Most Important Design Factors.”
Servers and other IT components continuously generate heat. If the cooling system fails, this heat generation does not automatically stop. The temperature in the server room or data center can therefore rise within a relatively short period of time.
However, how critical a malfunction becomes depends heavily on the specific system. Heat load, room size, thermal mass, airflow, and existing redundancies determine how much time is available to respond.
How quickly does the temperature rise in the event of a failure?
There is no universal time estimate for this. A small server room with a high heat load and low air volume can heat up significantly faster than a large data center with extensive infrastructure and thermal reserves.
Another critical factor is which component has failed. The failure of a single cooling unit in a redundant system has different consequences than a complete failure of the cooling or power supply.
Therefore, for critical systems, it is important to consider—as early as the planning phase— how the system will behave thermally under various failure scenarios.
What types of malfunctions can affect IT cooling?
A cooling system consists of numerous components. Accordingly, the causes of a malfunction can vary widely.
- Failure of a cooling unit or fan,
- malfunction of the mechanical refrigeration system,
- failure of a chiller or a pump,
- power outage,
- sensor or control system failure,
- Communication failure between multiple devices,
- unusually high IT heat load or changes in airflow.
Therefore, operational safety depends not only on the reliability of the cooling unit itself. The entire cooling chain must be taken into account.
How should a malfunction be detected?
Malfunctions should ideally be detected before critical temperatures are reached in the IT equipment. To this end, the control system monitors relevant operating conditions and measured values of the system.
Depending on the system, for example, temperatures, fan operation, filter conditions, pressures, the refrigeration circuit, pumps, or communication between devices can be monitored.
If a malfunction is detected, the system must respond in a defined manner. In addition to a local display, messages can be forwarded to a higher-level building management system or other monitoring systems.
What happens in a redundant cooling system?
If the cooling system is designed with redundancy, additional cooling capacity may be available in the event of a malfunction. In a properly controlled N+1 system, for example, another unit can take over the missing capacity.
The control system is crucial here. It must detect the failure, trigger the necessary switchover, and control the remaining group of units in such a way that the required cooling capacity continues to be provided.
We explain in detail how N, N+1, and 2N are structured and why the control strategy plays a key role in this process in the article “Redundancy in Data Center Cooling—N, N+1, and 2N: Explained Simply.” Why isn’t a fault message alone sufficient?
Why isn’t an alarm message alone sufficient?
An alarm notification informs the operator of a fault, but does not resolve its effects. For critical systems, it should therefore be determined which response can occur automatically and when intervention by the operator or service personnel is required.
In redundant systems, for example, the system can automatically switch to a different cooling unit. At the same time, the actual cause of the malfunction should be reported so that it can be resolved and the intended redundancy is once again fully available. Therefore, a clear distinction between warnings, malfunctions, and critical operating conditions is particularly important.
It is therefore particularly important to make a clear distinction between warnings, malfunctions, and critical operating conditions.
What happens after a power outage?
The behavior following a power outage must also be taken into account for critical IT systems. After power is restored, cooling units should be checked and brought back online in a defined sequence.
In doing so, it may be advisable to avoid high simultaneous power-on loads and to first start the components necessary for heat dissipation. The specific restart plan depends on the system structure and the existing power supply.
If cooling is to continue even during a power outage, the emergency power or UPS concept and the cooling system must also be coordinated. In doing so, the entire supply chain must be considered—not just the actual cooling unit.
Why should failure scenarios be considered as early as the planning stage?
A system should not be designed solely for normal operation. For critical IT, it is equally important to know how it will behave in the event of a failure of individual components.
Typical questions during the planning phase include, for example:
- Which components can fail without causing the cooling capacity to fall below the required level?
- How quickly does the temperature rise in the event of a complete or partial cooling failure?
- Which components are automatically activated?
- How are malfunctions and critical temperatures reported?
- Which shared components could affect multiple cooling units simultaneously?
- How does the system behave once power is restored?
The answers determine which redundancy, control, and monitoring functions are actually required.
Reliability Through Coordinated Control
When planning IT cooling systems, HANSA considers not only the required cooling capacity, but also how the system behaves under various operating and fault conditions.
Especially in systems with multiple units, the system’s own control technology plays an important role. Units can communicate with one another, exchange operating status information, and—depending on the system design—handle switching and redundancy functions.
The required functions are determined on a project-by-project basis. The goal is a cooling system that not only operates efficiently during normal operation but can also respond in a controlled manner to foreseeable malfunctions.
Server rooms and data centers change over the course of their service life. New generations of servers, higher rack capacities, or additional IT systems can cause a cooling system that was originally adequately sized to reach its limits.
At the same time, existing server rooms often cannot be completely redesigned. Space constraints, airflow paths, power supply, and existing cooling systems set clear parameters. Modernization therefore begins with the question of where the actual limits of the existing system lie.
When should an existing IT cooling system be reviewed?
Replacement or expansion is not something to consider only when the existing cooling system fails completely. Changes in operations can indicate even earlier that the existing design should be reviewed.
- IT capacity or the number of servers has increased significantly.
- Individual racks now have significantly higher power densities.
- The desired temperatures can only be maintained by running the equipment at high power.
- Local hotspots are developing.
- The existing cooling system no longer provides sufficient redundancy.
- Maintenance and repair costs are rising.
- The cooling system’s energy consumption is comparatively high.
- The existing cooling system is to be replaced or retrofitted.
Before modernizing, therefore, the current condition should first be assessed. In addition to the existing cooling capacity, the following factors are particularly relevant: the actual IT heat load and its spatial distribution.
Does an increase in IT load require the immediate installation of a new cooling unit?
Not necessarily. Insufficient cooling can have various causes. In addition to an actual lack of cooling capacity, an unfavorable airflow pattern may also be responsible for individual servers reaching excessively high inlet temperatures.
If cold and warm air mix or if air short-circuits occur, part of the available cooling capacity is not used effectively. Improvements to rack layout, cold and hot aisles, enclosures, or airflow paths can therefore already make a significant difference.
We explain these relationships in more detail in the article “Cold Aisle and Hot Aisle—Planning Airflow Correctly in the Data Center.”
How can additional cooling capacity be retrofitted?
If the existing cooling capacity is indeed no longer sufficient, the system can be expanded depending on the existing infrastructure. One option is to add additional cooling units.
However, it is not enough to simply check whether there is sufficient installation space. The power supply, chilled water supply, air ducts, and control systems must also be able to handle the additional capacity.
Especially for existing systems, a custom unit design can be helpful. Dimensions and air connections can then be adapted to existing rooms, shafts, and air ducts, rather than having to adapt the building structure to a standard unit.
Can free cooling be retrofitted?
In older IT cooling systems, some of the required cooling is sometimes generated mechanically year-round. Depending on the building and system structure, it is therefore possible to determine whether free cooling can be used to supplement or even replace the existing system with an appropriate design.
Whether direct or indirect free cooling is an option depends, among other things, on the structural possibilities, the required temperatures, and the requirements for outdoor and indoor air.
We explain the available methods in the article Free Cooling in Data Centers—How It Works and Possible Applications.
What should be considered when an existing chilled water supply is in place?
If a central chilled water supply is already in place, it can often be continued to be used during a modernization—provided that the capacity, temperature level, and hydraulic conditions are compatible with the new cooling units.
Conversely, it may make sense to replace the central chiller system independently of the air-side cooling units as part of a modernization project. Separating the IT cooling units from the refrigeration system offers flexibility in the selection and future modernization of the cooling technology.
We discuss the differences between integrated cooling systems and external chilled water supply in more detail in the article “Mechanical Cooling and Hybrid Cooling in Data Centers.”
How can a modernization be implemented without prolonged IT downtime?
A particular challenge with existing data centers is that IT operations often must continue during the modernization process. The replacement of the cooling technology should therefore be broken down into individual steps as early as the planning phase. Depending on the system, new cooling units can, for example, first be installed and commissioned before the old units are taken out of service. For redundant systems, existing reserves can be used for individual phases of the retrofit.
Depending on the system, for example, new cooling units can initially be installed and commissioned before old units are taken out of service. In the case of redundant systems, existing reserves can be utilized for individual phases of the retrofit.
It is crucial to determine, for each renovation phase, what cooling capacity and redundancy are actually available. Temporary operating conditions must be considered just as carefully as the eventual final state.
Reassess Existing Redundancy During Expansions
If the IT heat load increases, the existing redundancy may also change. A system that was originally designed as an N+1 system may no longer meet this criterion if the additional IT capacity consumes an increasingly larger portion of the reserve.
When planning expansions, therefore, you should not only check whether the maximum cooling capacity is still sufficient. Equally important is the question of how much cooling capacity is still available after a device fails or during a maintenance window.
You can find more on this in the article: Redundancy in Data Center Cooling—N, N+1, and 2N Explained Simply.
Custom Solutions for Existing Server Rooms and Data Centers
Standard solutions are not always suitable, especially for modernization projects. Existing buildings often dictate dimensions, transport routes, connection points, and available installation space.
HANSA can tailor IT cooling units to these conditions on a project-by-project basis. In addition to dimensions and equipment layout, elements such as airflow, heat exchangers, fans, refrigeration technology, and control systems can be tailored to the existing infrastructure. This allows existing cooling systems to be expanded, individual units to be replaced, or new cooling concepts to be gradually integrated into existing data centers.
This allows existing cooling systems to be expanded, individual units to be replaced, or new cooling concepts to be gradually integrated into existing data centers. The first crucial step is a thorough assessment of the existing infrastructure—and only then the selection of the suitable technical solution.