The energy efficiency of a data center depends not only on the cooling technology used, but also on how the system operates in actual use. We’ll show which factors influence the energy requirements of IT cooling, how efficiency can be assessed, and what potential partial-load operation, model-based control, and predictive maintenance offer.

Cooling is one of the major sources of energy consumption outside of the IT infrastructure itself. However, the extent of its energy consumption does not depend solely on the efficiency of individual cooling units. Temperatures, airflow, refrigeration, free cooling, performance reserves, and control strategies all interact as part of an integrated system.

Actual operation is particularly important: A cooling system is designed for specific maximum requirements but often operates operates below this design point for long periods of time. Good energy efficiency is therefore achieved above all when the cooling capacity adapts as closely as possible to the IT’s current heat load.

Do Not Cool More Than Necessary

Lower room temperatures do not automatically mean more reliable IT operation. Rather, suitable inlet conditions at the IT components are crucial.

If unnecessarily low temperatures are specified, the cooling system may have to work harder, and the potential for free cooling may be limited. Appropriate temperature setpoints are therefore an important foundation for energy-efficient operation.

We discuss in detail which temperatures are suitable for server rooms and data centers in the article What Temperatures Are Suitable for Server Rooms and Data Centers?

Direct Airflows as Precisely as Possible

Even a high-performance cooling system operates inefficiently if the cooled air does not reach where it is needed. If warm and cold airflows mix, or if air short-circuits occur, it is often necessary to move more air or cool it more intensively than is actually required.

A clear separation of supply and exhaust air—or cold and warm zones—can therefore make better use of the available cooling capacity. At the same time, fan performance and the required temperature differences can be optimized. We explain more about this in the article:

We explain more about this in the article Cold Aisle and Hot Aisle—Properly Planning Airflow in the Data Center.

Make the Most of Free Cooling

If outdoor conditions permit, heat can be dissipated with little or no use of mechanical cooling. While electrical energy is still required, for example, for fans, pumps, and control systems, the energy-intensive compressor operation can be reduced or temporarily avoided.

The extent of this potential depends, among other things, on the required IT temperatures, the location, and the selected cooling method. Higher permissible operating temperatures can extend the periods during which free cooling can be utilized.

We explain direct and indirect methods in the article Free Cooling in Data Centers—How It Works and Possible Applications.

Operating Fans and Pumps According to Demand

Energy efficiency depends not only on how the cooling is generated. Transporting air and the cooling medium also requires energy.

For example, if a high air flow rate must be maintained continuously, even though the current IT heat load is significantly lower, this results in unnecessary energy consumption. Speed-controlled fans and pumps make it possible to adjust the flow rate to actual demand.

This requires a control system that monitors the current system status and coordinates the components effectively with one another.

Partial load is often more important than the design point

Cooling systems are designed to provide sufficient capacity even under high IT loads and unfavorable operating conditions. However, this design point does not necessarily correspond to typical operating conditions.

If IT utilization fluctuates or a data center is expanded in stages, the actual cooling capacity required may, over an extended period, period. Furthermore, redundancy concepts can result in more cooling capacity being installed than is needed simultaneously during normal operation.

Therefore, a cooling system should not only operate efficiently at the maximum operating point; it is equally crucial how fans, pumps, refrigeration units, and multiple cooling units installed in parallel work together during partial-load operation.

We examine this relationship in more detail in the article “Partial-Load Operation in IT Cooling—Why Maximum Efficiency Isn’t Everything.”

Controlling Multiple Cooling Units as a Single System

Energy optimization becomes particularly interesting when multiple cooling units jointly serve an IT load. In this case, the question is not only what total capacity is required, but also how this capacity is distributed among the available units.

Depending on the system design, it may be more energy-efficient to shut down certain units, operate multiple units at reduced capacity, or combine different cooling methods. At the same time, requirements for redundancy and operational reliability must be maintained. The most energy-efficient operating mode is therefore not automatically the one with the least number of units running.

At the same time, requirements for redundancy and operational reliability must be maintained. The most energy-efficient operating mode is therefore not automatically the one with the fewest units running.

Control Becomes a Critical Efficiency Factor

The more complex the cooling system becomes, the greater the importance of the control strategy. Temperatures, IT heat load, outdoor conditions, equipment statuses, and available cooling methods change continuously during operation.

A traditional control system reacts to measured conditions and maintains defined setpoints. More advanced approaches can additionally take system models and temporal trends into account to proactively determine suitable operating states.

Especially when multiple cooling units interact and the heat load fluctuates, model-based control thus opens up additional opportunities for energy optimization.

We discuss how such approaches work and what role AI and model-based predictive control can play in this context in the article “Model-Based Control of Data Center Cooling – The Potential of AI and MPC.”

Energy efficiency doesn’t end with commissioning

Even an efficiently planned system can change during its operating life. Clogged filters or heat exchangers, altered airflow paths, wear and tear, and a growing IT infrastructure can cause operating points and energy consumption to gradually shift.

Operational data helps make such changes visible. When measurement values and system statuses are analyzed over an extended period, deviations and trends can be identified that can be leveraged for maintenance and energy optimization.

As a result, energy efficiency and maintenance are becoming increasingly intertwined. We explore the opportunities this presents in the article Predictive Maintenance for IT Cooling Systems—Detecting Faults before they lead to a failure.

Efficient IT Cooling as a Comprehensive System

Consequently, the greatest potential for optimization often does not arise from a single measure. Temperature, airflow, passive and mechanical cooling, fans, pumps, and control systems must be considered together.

HANSA can tailor IT cooling systems to specific projects based on heat load, building infrastructure, and the desired operating strategy. By combining equipment manufacturing, refrigeration, and control technology, we can take into account not only the required cooling capacity and operational reliability, but also different operating conditions and their energy requirements.

Power Usage Effectiveness, or PUE for short, is one of the best-known metrics for evaluating the energy efficiency of data centers. It compares the data center’s total energy consumption to the energy consumption of the actual IT equipment.

In this way, PUE reveals how much additional energy, beyond that used by servers, storage, and networking equipment, is required for the technical infrastructure. This includes, in particular, the cooling system.

How is PUE calculated?

In simple terms, the PUE is calculated using the following formula:

PUE = Total energy consumption of the data center / Energy consumption of the IT

For example, if a data center requires a total of 1,500 kWh of electricity and 1,000 kWh of that is attributed to the IT, the PUE is 1.5.

In this simplified example, the additional 500 kWh are attributed to the supporting infrastructure. This can include, among other things, cooling, fans, pumps, power supply, and other technical equipment.

What does a low PUE mean?

The theoretically lowest PUE value is 1.0. In this case, all energy consumed would be directly attributed to IT. Mathematically, no additional energy would be required for cooling, power distribution, and other supporting systems.

In real data centers, the PUE is above 1.0. The smaller the additional energy requirement of the infrastructure is in relation to the IT energy, the closer the metric approaches this value.

A decreasing PUE can therefore be an indication that the supporting infrastructure is operating more efficiently. However, it does not yet show which specific technical measure is responsible for this.

How does cooling affect the PUE?

IT cooling can account for a significant portion of energy consumption outside of the IT systems themselves. Accordingly, improvements in cooling also affect the PUE.

Possible areas for improvement include, for example:

  • consistent separation of warm and cold airflows,
  • appropriate temperature setpoints,
  • maximizing the use of free cooling,
  • demand-controlled fans and pumps,
  • efficient mechanical refrigeration,
  • optimized part-load operation, and
  • coordinated control of multiple cooling units.

The PUE can thus indicate whether the total energy demand of the infrastructure is changing. For targeted optimization, however, it is also necessary to determine which components are responsible for the respective energy consumption.

Why can the PUE fluctuate over the course of a year?

The operating conditions of a data center are not constant. Outside temperatures, IT load, and required cooling capacity change throughout the day and year.

For example, when outdoor temperatures are low, a larger proportion of the heat can be dissipated via free cooling. Conversely, when outdoor temperatures are high, more mechanical cooling may be required. This also changes the energy requirements for cooling.

For a meaningful assessment, it is therefore often more useful to consider data over longer periods of time rather than a single, momentary PUE value.

Why can the PUE worsen when IT utilization is low?

PUE is a ratio. If the power consumption of the IT equipment decreases, the energy requirements of the supporting infrastructure do not necessarily reduce in the same proportion.

Pumps, fans, cooling systems, and other equipment continue to consume energy even at low IT loads. Especially in the case of oversized or poorly controlled systems, the relative share of infrastructure energy consumption can therefore increase.

Good part-load performance is therefore not only important for absolute energy consumption but can also be clearly reflected in the PUE.

Why is PUE alone not sufficient for evaluating cooling?

PUE considers the entire data center and does not automatically distinguish between the individual energy consumers within the technical infrastructure. Therefore, a PUE value does not directly indicate how efficiently, for example, a specific cooling unit, a chiller, or a fan operates.

Different locations, climatic conditions, IT load factors, redundancy requirements, and system designs also influence this metric. PUE values from different data centers should therefore not be compared with one another without knowledge of these contextual factors.

Additional operating data is required for the technical optimization of cooling. This includes, for example, the energy consumption of individual components, temperatures, airflow rates, operating states, and the actual heat load dissipated.

From the Metrics to Actual Optimization

A metric such as PUE can show how the overall energy-related situation of a data center is evolving. However, the actual optimization begins one level deeper.

To achieve this, it must be clear when which cooling units are operating, what capacity is actually required, and how much energy fans, pumps, and refrigeration systems consume under various operating conditions.

This creates additional opportunities for optimization, especially when multiple cooling units are operating in parallel. Instead of solely adhering to fixed setpoints, the control system can take into account which combination of units and operating conditions provides the required cooling capacity as efficiently as possible.

Cooling systems for server rooms and data centers must provide sufficient cooling capacity even under high IT heat loads and unfavorable environmental conditions. In actual operation, however, this maximum capacity is often required only intermittently.

Therefore, energy consumption is not determined solely by how efficiently a cooling system operates at its design point. At least as important is how the system performs under partial load and how well its performance can be adapted to changing operating conditions.

Why does the heat load of a data center fluctuate?

The heat load generated by IT equipment is not necessarily constant. It depends, among other things, on the installed hardware and its current utilization. Changes can occur throughout the day, due to varying computing loads or the expansion of the IT infrastructure.

This becomes particularly evident in data centers that are being expanded in stages. The cooling system may already be sized for a future expansion phase, even though initially only a portion of the planned IT capacity is installed.

Added to this are reserves for high outdoor temperatures and redundancy requirements. The installed cooling capacity can therefore be significantly higher than the capacity actually required during normal operation. Why can an oversized cooling system operate inefficiently?

Why can an oversized cooling system operate inefficiently?

Capacity reserves are important for scalability and operational reliability; they only become problematic when the system cannot sufficiently adapt to lower demand.

If fans, pumps, or chillers run continuously at high capacity even though only a portion of the maximum cooling capacity is needed, this results in unnecessary energy consumption.

Good planning therefore considers not only the maximum required cooling capacity, but also the expected operating points below that.

Speed control reduces energy consumption

An important approach in part-load operation involves speed-controlled fans and pumps. If the required air or volume flow decreases, their speed can also be reduced.

This can be particularly energy-efficient for fans, since the required drive power, under suitable system conditions, can decrease disproportionately as the speed decreases.

However, this requires that airflow, pressure losses, and control be considered together. An efficient component alone does not make for an efficient overall system.

Refrigeration systems must also be able to handle partial loads

In addition to fans and pumps, the refrigeration system must also be able to adapt to changing loads. If mechanical refrigeration is required, only as much cooling capacity should be generated as is necessary for the respective operating condition.

At the same time, the possibilities for free cooling may change. Depending on outdoor conditions and required temperatures, mechanical cooling may be needed completely, partially, or not at all.

Efficient part-load operation therefore also means combining free and mechanical cooling in a sensible way.

How should multiple cooling units work together?

In larger server rooms and data centers, the required cooling capacity is often distributed across multiple units. This provides additional flexibility for operation.

For example, when the heat load is low, some of the units could be shut down. In other systems, it may be more energy-efficient to operate multiple units simultaneously at reduced capacity.

There is no one-size-fits-all answer as to which strategy is better. It depends, among other things, on fan performance, heat exchangers, refrigerant supply, airflow, and the efficiencies of the individual operating points.

The control system should therefore not only determine how much total cooling capacity is required, but also how this capacity is best distributed among the available units.

Efficiency and redundancy must be considered together

The most energy-efficient operating mode must not compromise the required operational reliability. If, for example, an N+1 concept is planned, the required reserve must be maintained even during optimized operation.

At the same time, redundancy does not necessarily mean that a backup unit must remain permanently shut down. Depending on the system design, operating hours can be distributed across multiple units, or units can be rotated on a regular basis.

This allows for a combination of redundancy, even utilization of components, and part-load operation. We explain more about the various redundancy concepts in the article Redundancy in Data Center Cooling—N, N+1, and 2N—Explained Simply.

Fixed setpoints do not always utilize the full potential

Traditional control strategies often rely on fixed setpoints and defined on/off conditions. For many applications, this approach is reliable and entirely sufficient.

However, as system complexity increases, so does the number of possible operating states. Multiple cooling units, fluctuating heat loads, variable outdoor temperatures, free and mechanical cooling, as well as redundancy requirements must all be taken into account simultaneously.

In such cases, it is not always immediately apparent which operating state is the most energy-efficient. A single optimally controlled fan, for example, does not necessarily mean that the entire cooling system is operating at its most energy-efficient point.

From Demand-Based to Predictive Operation

Demand-based control responds to the current heat load and adjusts the cooling capacity accordingly. Model-based methods go a step further. In this approach, the behavior of the entire system is taken into account in a model.

These methods take the behavior of the entire system into account in a model. On this basis, the control system can evaluate various possible operating states and, for example, decide which units should be operated at what capacity.

If temporal trends or forecasts are also taken into account, the control system can not only react to a condition that has already occurred, but also incorporate future developments into the optimization process.

This approach can be particularly interesting in cases of fluctuating IT heat loads and multiple interacting cooling units. We’ll examine how such systems work in the next article: Model-Based Control of Data Center Cooling – The Potential of AI and MPC.

Consider Partial Load Already During Planning

Energy-efficient IT cooling should therefore not be evaluated solely based on its maximum cooling capacity. Equally important is how flexibly it can respond to different load conditions.

For custom-designed IT cooling systems, HANSA can tailor the number of units, fans, heat exchangers, refrigerant supply, and control to the expected operating conditions. For systems with multiple units, it is also possible to specify how they communicate with one another and distribute their capacity based on actual cooling demand.

This allows planners to take into account from the very beginning that a data center should not only operate reliably at its maximum design capacity, but also efficiently during the many hours of partial-load operation.

The more complex a cooling system becomes, the more demanding its control becomes. In a data center, multiple cooling units, fans, pumps, free cooling, and mechanical refrigeration can all work together. At the same time, the IT heat load and ambient conditions change during operation.

Traditional control strategies can operate such systems reliably; however, model-based methods go a step further: They model the system’s behavior and can evaluate different operating states before these are actually set.

What does model-based control mean?

In model-based control, the system does not react exclusively to current measured values and fixed setpoints. In addition, a model is available that describes the relationships within the cooling system.

Such a model can, for example, take into account how changes in fan speed, cooling capacity, or operating conditions affect temperatures and energy consumption.

This not only answers the question of whether sufficient cooling capacity is available. The control system can also determine which operating state provides the required cooling as efficiently as possible. What is Model Predictive Control?

What is Model Predictive Control?

Model Predictive Control, or MPC for short, is a method of model-predictive control. It uses the system model to calculate the effects of different control variables over a future time period.

The control system can compare various possible operating modes and determine a suitable strategy based on this. After a short time, the calculation is performed again using current measured values.

This results in continuous optimization, in which not only the current system state but also the expected future development can be taken into account.

What role can artificial intelligence play?

Not all relationships within a complex cooling system can be easily described using fixed equations. Here, data-based models can serve as a supplement to physical models .

For example, neural networks can use operational data to learn relationships between input variables and the behavior of a system. Physical and data-based models do not have to be in conflict with one another. Both approaches can be combined.

The key is not to use as much artificial intelligence as possible; rather, it is crucial that the model describes the relevant system behavior sufficiently well and that the control strategy derived from it complies with the technical constraints of the system.

Why is this approach of interest for data centers?

Particular potential arises where multiple degrees of freedom are present simultaneously. With multiple cooling units, for example, the required cooling capacity can be provided in various ways.

A high-level optimization could take into account, among other things:

  • the current and expected IT heat load,
  • temperatures at relevant points in the cooling system,
  • outdoor conditions and opportunities for free cooling,
  • the energy requirements of fans and pumps,
  • the operation of mechanical refrigeration,
  • the available capacity of individual cooling units, as well as
  • specified requirements for redundancy and operational reliability.

The goal would not merely be to maintain a single setpoint, but to determine an optimal operating state for the entire cooling system .

Optimizing Multiple Chillers Together

Model-based control is particularly interesting for systems with multiple cooling units operating in parallel.

Given the same required total cooling capacity, different combinations of units may be possible. Depending on the respective operating points, it may make sense, for example, to operate multiple units at reduced capacity or to concentrate the required capacity more heavily on individual units.

Added to this is the question of when free cooling can be used and when additional mechanical cooling is required. A higher-level control system can consider these interactions collectively, rather than optimizing each unit exclusively on its own.

Can future IT loads also be taken into account?

Another advantage of predictive methods is the ability to incorporate known or foreseeable developments into the control system. For example,

For example, if it is known from operational data or the higher-level IT infrastructure that the computing load changes regularly, such information can generally also be used for cooling optimization.

This requires suitable data and interfaces. Not every IT load can be reliably predicted. For this reason as well, a predictive system must always be able to handle unexpected load changes.

Operational reliability remains the responsibility of the base control system

Especially in the case of critical infrastructure, a higher-level optimization must not become a prerequisite for safe operation.

A sensible approach therefore separates the reliable basic control of the cooling units from a higher-level optimization layer. If this optimization fails, the necessary cooling function must still be guaranteed.

This allows an intelligent control system to unlock additional optimization possibilities without replacing fundamental safety and control functions.

etaSmart as an Example of Model-Based Control

With etaSmart, HANSA etaTECH has already developed a model-based control system for HVAC systems. Both neural networks and physics-based models are used. Multiple devices can be consolidated at a higher level, while the actual device control continues to be handled by the DDC control system.

etaSmart was initially developed and put into practical use, in particular, for swimming pool ventilation systems. The experience gained there demonstrates how complex HVAC systems can be modeled and optimized for energy efficiency at a higher level.

Applying this approach to data center cooling is an interesting future field of application. Particularly in cases involving multiple interacting cooling units, different operating states, and fluctuating heat loads, the basic structure provides a solid foundation for model-based optimization.

To achieve this, the models, target variables, interfaces, and safety conditions would need to be adapted to the specific requirements of IT cooling. etaSmart is therefore not intended here to be viewed as a already established control system for data centers, but rather as a technological foundation for a potential future application.

From Optimization to Condition Monitoring

Models can be used for more than just control. If the expected behavior of a component is compared with its actual behavior, increasing deviations can provide indications of changes or potential faults.

This creates a link between intelligent control, system monitoring, and condition-based maintenance.

This is exactly where the next article picks up: Predictive Maintenance for IT Cooling Systems—Detecting Malfunctions Before a Failure Occurs.